Recent changes to this wiki:
Ai Ling Chen
No more Wednesday for the capstone team. Sigh.
Added Hardware Design Specification section Jan 6th 2009
Scott Schuehle
Added list of folks.
initial scheduling table.
Fixed link.
Added reference to software on the psas gitweb.
Removed bad filename.
Added NSR test.
Oops, title.
Added link to attachment.
Added framework for capstone pages.
Added video and images of latest noseconse seperation ring test
updated fall 2008 student club activities
Added winter term intro meeting to schedule page.
Fixed some image links to nosecone tip fabrication images
Format fixes for newly commited content of LV2cLineCutter page
Updates to line cutter drawings and re-export of pdf/png
Add notes on creating PSAS git repositories.
Minor updates to line cutter design
Renamed work in progress pages as they are specific to LV2 not LV2c
Moved nosecone tip fabrication photos to nosecone directory
Removed some duplicated jpgs/avis from consolidated directory
Consolidated more nosecone fabrication images
Added thumbnailed versions of images and modified markdown links accordingly
Updated wiki page with more fabrication and materials details, added pdf and png of LV2c line cutter
Added more pictures of nose cone plug fabrication and countersinking modules operations
checked in missing file
Added additional extranious pictures of barrel nut fabrication process
Added mdwn page for nosecone seperation ring
Added link to LV2c aeroshell construction page
Moved motor ferring pics into LV2cFinClamp dir
Moved nosecone turning avis into LV2cNosecone directory
Moved pictures and commentary of fin clamp and barrel nut fabrication to Lv2cFinclamp directory
Moved nosecone pics into LV1cNosecone directory and updated markdown accordingly
Added coil wire comments to fabrication instructions of LV2c line cutter docs
Checking of images and draft of LV2c line cutter docs
Modified line cutter to use 1/8 inch sheer pin, move vent holes, simplified stop block design
Updates to line cutter design
Corrected / Update accelerometer table notes
Attempted to improve formatting
Added accelerometers / Added sizes / Re-ordered
Added some new accelerometers.
Added a column for package size in millimeters.
Partially re-ordered the rows by dynamic range (range/noise).
Also updated/checked some of the old data.
Added some new accelerometers.
Added a column for package size in millimeters.
Partially re-ordered the rows by dynamic range (range/noise).
Also updated/checked some of the old data.
Modified LV2c line cutter to ease assembly process and compensate greater margin of error in as-built devices.
Moved new line cutter design to LV2c specific subdir
Added updated line cutter cad drawings, design still in testing
Oops, spelling.
Initial solid state magnetometer page
Added link to aerodynamics textbook
Formatting
Added this year's budget info
Added link to *this* year's budget
Removed this year's data from next year's budget
update instructions for ziggurat submodule
Added unformatted sections from last year's budget. To Be Edited.
Added link to SFC budgeting system login page
Created 2009/2010 budget page
Added link to 2009/2010 Budget page
Added plan and link to bob4lpc software.
update status for November 2008
Added link to code on psas git web. Changed who has Bob4 Board
Added link to application guide for Bob4 from Decade Engineering site.
Added comment regarding race condition in lpc2148
Added status page
Status page for lpcusb isoc
Hokey smokes! That trick didn't work..silly markdown....