At tonight's meeting we got everyone on board for an end of July for the next launch of LV2.3.
We had previously discussed launch days and came up with end of July, we were just waiting for a few key people to get on-board. Now we think we have everybody so:
- It's Official, Launch date set for Sunday, July 31st.
- Logistics
- Systems Integration Day
- Launch Day Logistics
- Timeline
- Needs Ride
- Has Room in Car
- Has a hotel room to share (not camping)
- Checklists
- Launch Tower Computer (LTC) Box List
- TO REPAIR:
- Launch Control (LC) Loose Items
- Launch Control (LC) Box Items
- To Get:
- General Things to bring
It's Official, Launch date set for Sunday, July 31st.
As a backup we picked Sunday August 21st.
We will be launching at the Oregon Rocketry's Brothers launch site in Eastern Oregon.
If you would like to attend you can drop us a line at info@psas.pdx.edu
Logistics
Systems Integration Day
In order to prep the rocket for the launch we need to put together all the parts and prep the rocket for launch. The goal will be to verify as much of the rocket will be ready for launch and to give us a couple of weeks to fix things if necessary.
Agenda:
- put together the nose cone separation ring (NSR)
- put in the line cutters
- work on checklists
- go over avionics and test RF system if possible
- test launch tower computer (LTC)
- go over packing lists
- verify the launch waiver
- find all the parts!
Launch Day Logistics
Timeline
| Date | Time | Activities |
|---|---|---|
| Tuesday 07/26 | 7:00pm - 10:00pm | Final go/no-go decision on launch (depends on weather). |
| Saturday 07/30 | 8:30am | Gresham early crew leaves. Coordinate with Rob and Chris |
| Saturday 07/30 | 8:00am - 10:00am | Meet at Tim's house in Tigard: Final checklists, coordinateion and packing. |
| Saturday 07/30 | 10:00am - 3:00pm | Drive to Brothers, Oregon launch site (4.5 hour drive). |
| Saturday 07/30 | 3:00pm - 7:00pm | Set up launch site. |
| Saturday 07/30 | Evening | Final prep, marshmallow roast, star viewing. |
| Sunday 07/31 | 8:00am - 12:00pm | Final launch prep. |
| Sunday 07/31 | 12:00pm - 2:00pm | Target time for launch! |
| Sunday 07/31 | 2:00pm - 4:00pm | Recover rocket, pack up. |
| Sunday 07/31 | 4:00pm - Evening | Possibly dinner in Bend, return to Portland (4.5 hour drive) |
Needs Ride
- Nathan
- Jamey and Sarah
- Naga
- Ian (from NE Portland)
- Jen
- Tim
- Keith
Has Room in Car
- Ben (4 seats avail)
- Eric (1 left, leaving at 1PM Sat.)
- Rob (1 seat)
- Dave (1 seat)
- Andrew (at least 1)
- Zhenkun (2 seats)
- Andrew L (4 seats avail+room for equipment)
Has a hotel room to share (not camping)
Checklists
Last launches checklists still stand:
On our integration test day we cleaned out some of the old equipment boxes and redid their checklists. Here are the new box checklists:
Launch Tower Computer (LTC) Box List
| Check | Number | Item |
|---|---|---|
| 1x | Box of 10 Amp 3AG fast action fuses | |
| 2x | LTC to Tower U-bolts | |
| 1x | Banana shorting bar | |
| 1x | APP Y connector | |
| 1x | LED viewing cup | |
| 1x | Bag of 12 in reusable zip ties | |
| 1x | APP extension cord | |
| 1x | 33' N to N coax cable | |
| 1x | APP to igniter alligator leads | |
| 1x | Igniter and safety away box assembly | |
| 1x | Pen, Sharpie, Notepad | |
| 1x | LTC marked Toolbox | |
| 1x | Iginiter test light bulb | |
| 1x | Dust rag |
Plus the LTC itself
TO REPAIR:
Replace igniter alligator leads
Launch Control (LC) Loose Items
| Check | Number | Item |
|---|---|---|
| 1x | 4'x4' plywood antenna tower base + 6 5/16" bolts & nuts (should be attached to base) | |
| 1x | LC tripod + J brackets | |
| 1x | Large LC antenna pole | |
| 1x | small LC antenna pole | |
| 1x | 2 m J-pole antenna w PL239 connector | |
| 1x | LC Table | |
| 2x | pop up tents |
Launch Control (LC) Box Items
| Check | Number | Item |
|---|---|---|
| 1x | 40' PL239 2m band cable | |
| 1x | 33' N connector 5.8 GHz WiFi cable | |
| 1x | RPTNC Female to Male N adapter | |
| 1x | Female to Female N Barrel | |
| 1x | 2m band mic head | |
| 1x | Yellow caution tape | |
| 1x | Female PTC TNC monopole WiFi antenna | |
| 1x | 120 V AC 13.8 V 15 A DC converter | |
| 1x | 14.5" black zip ties | |
| 1x | bag of 12 V fuses | |
| 1x | Yaesu 1500m instruction manual | |
| 1x | 5' 12 V APP to APP cable | |
| 1x | 3' 4 to 1 APP connector | |
| 2x | APP Y connector | |
| 3x | APP to 5 mm Barrel | |
| 1x | APP to Yaesu power | |
| 1x | 3' cat 5 cable | |
| 1x | 3' 6 plug mains power strip |
To Get:
- Tent stakes for pop up tents
- Repair APP Y connector
- F TNC to N male connector
- RA drill for sand screws
- Generator for RA drill
- socket adapter for RA drill/sandscrews
- breaker bar
General Things to bring
Also listed in the master check list:
- sun glasses
- water
- water bottle(s)
- food
- hat
- sunscreen
- Binoculars
- camera tripod
- camera
- flashlights
- camping supplies