CapstoneLV2bProjectReport http://psas.pdx.edu/CapstoneLV2bProjectReport/ PSAS FinalTesting http://psas.pdx.edu/CapstoneLV2bProjectReport/ConstructionAndTest/FinalTesting/ http://psas.pdx.edu/CapstoneLV2bProjectReport/ConstructionAndTest/FinalTesting/ Wed, 02 Jul 2008 20:26:19 -0700 2008-07-03T03:26:19Z <p>* System specifications</p> <ul> <li>Max application specific current consumption</li> <li>Max MIPS</li> <li>Time to first instruction (power up sequence and times)</li> <li><p>OV, CB, and brownout reset to first instruction sequence and time</p></li> <li><p>Environmental testing:</p> <ul><li>Vibration</li> <li>Temperature</li> <li>Pressure</li></ul></li> </ul>