![]() |
|
|
Page Under Construction
LV2 airframe completed. 
Fabrication of Nosecone Tip Pictures (Oct, 2007): NoseconeTipFabrication
Fabrication of Nosecone Plug on lathe (May 2008): noseconefabrication
Airframe Frabrication (May 2008): AirframeFabrication
Proposed airframe change: CameraModule
Attachments:
